As a wonderful addition to the Leavenworth National Cemetery, this natural stone project serves as a Columbarium for fallen service-people. Not only was it an honor to work on, but H&Parris Builders was selected specifically for the quality of work our craftworkers provide.
Commissioned to tuckpoint and restore the brickwork on this beautiful church in historic Downtown Liberty, MO, we take pride in our ability to match existing products – even from the early 20 th century and even before.
Quality Hill Apartments are located near 10th and Pennsylvania in downtown Kansas City. This large restoration project secured falling bricks from the parapets of two buildings – keeping locals safe and dressing up the brick work.
A massive 10,000 sqft Travel stop is being added to 210 highway between Kansas City and Richmond, MO – being the sole fueling center for about 20 miles. The mixture of split-face masonry units and thin natural stone made for one of the best looking combinations.
A small bank branch in Lee’s Summit but a large structural masonry project. The use of “Tie Beams” is a rare occurrence, but our craftworkers knowledge helped this be a huge success.
Hired to completely remodel the old Hen House in Merriam, this new Ross Dress 4 Less totally changes the face of the old strip center. Structural and architectural masonry were large portions of this project.
A ground up build of a new appliance store in the Prairiefire area of Overland Park, Kansas, this project boasts a unique blend of manufactured Cordova Stone and modular brick.
Working through the harsh winter of 2024, H&Parris Builder's crew erected this impressive 15,000sqft warehouse, all within 6 weeks, for an incredible customer.
This University of Saint Mary's Dormitory in Leavenworth, Kansas was built and completed for Monarch Build in early 2024, including two CMU stair towers and brick veneer.
Two mirrored, but nearly identical, school additions, located in Blue Springs, and Lee's Summit, Missouri respectively, are both comprised of two CMU classrooms with a brick exterior, and a gymnasium. These additions were built simultaneously by 25 crew members of H & Parris, finishing in late spring of 2025.